Click to Home
Aero Center
Thursday, June 20, 2013
Today is 
Go To Search
Home
PrintRSS
News FlashView All
Construction begins on Memorial Highway between Bismarck and Mandan
Starting Friday, June 21, construction will take place on Memorial Highway between Bismarck and Mandan. Some of the work is scheduled to be completed during the night to cause minimum disruption to the traveling public. Additional Info...
Levee Removal Grade Raise Project Underway on Riverwood Drive
The levee removal grade raise project on Riverwood Drive is underway. The first phase will include tree removal on the east side of Riverwood Drive and south of Bismarck Expressway. Read on...
Emergency Notifications – Are You Prepared for a Tornado?
If an emergency occurs, where do you take shelter and how would you receive your emergency notifications? It’s best to plan ahead for shelter and ensure the capability of receiving emergency notifications through various methods. Read on...
Sump Pump Discharges Should Not Go to the Sanitary Sewer System
Residents of Bismarck are asked not to discharge flows from sump pumps to the sanitary sewer system via floor drains in their homes. Instead these flows should be directed outside where they can flow to the storm drain system. Read on...
City of Bismark
221 N. 5th Street
P.O. Box 5503
Bismarck, ND 58506-5503
Phone: 701-355-1300
Fax: 701-222-6470
Department Contacts
Follow Bismarck onFacebookTwitter
Home     Calendar     Privacy Statement     Disclaimer     Contact Us     Sitemap     Accessibility     Copyright Notice     Powered by CivicPlus
Home
PrintRSS