MPO Studies and Projects

Current Studies

Bismarck-Mandan School Safety Crossing Study 2016
   
NE Morton County Future Land Use Plan
 

Completed Studies

43rd Avenue Corridor Study

71st Avenue / Centennial Road Study

2010-2035 Long Range Transportation Plan

 
2010-2035 Long Range Transportation Plan-Final Report (Allow several minutes to download)
2010-2035 LRTP Appendices to Final Report (Allow several minutes to download)

2015-2040 Long Range Transportation Plan


Envision 2040 Final Report
Envision 2040 Executive Summary
Envision 2040 Appendices 
 

Bismarck Burleigh Fringe Area Road Master Plan 2014


Burleigh County-Bismarck-Lincoln Final Report
Appendix Burleigh County Plates

Bismarck Traffic Signal Optimization/Coordination Study

Bismarck School Crossing Safety Study 2005


Final Report and Appendix
Chapter 4 Individual School Recommendations
 

Burleigh County Future Land Use Plan


MPO Area Final Report
Full Study Area Final Report
  


Downtown Bismarck Sub Area Study


Downtown Bismarck Sub Area Plan
DBSAP Appendix - Table of Contents
DBSAP Appendix - Starting
DBSAP Appendix - Designing
DBSAP Appendix - Implementing

I-94 Corridor Study Final Report

Lincoln Road Corridor Study


Lincoln Road Corridor Study Final Report
Lincoln Road Corridor Study Executive Summary
  
Mandan and Bismarck Corridors Improvement Study 

Mandan Morton Fringe Area Road Master Plan 2014


Morton County-Mandan Final Report

Memorial Highway Corridor Study


Memorial Highway Corridor Study Final Report (allow several minutes to download)
Memorial Highway Market Study Report

North Mandan Sub Area Study


Executive Summary
Final Report
Appendix

Northeast Bismarck Subarea Study

Northern Bridge Corridor Study

Northwest Sub-Area Study


NW Sub-Area Study Final Report
NW Sub-Area Study Executive Summary Document

Highway 83 Study

Interstate and Bismarck Expressway Corridor Study
(Large document-please allow several minutes to download)

Lincoln/Bismarck Connection

Pavement Management Program


Bismarck Final Report 2012
Mandan Final Report 2012

Regional Land Use Study

Regional North-South Beltway Corridor Study


Regional North-South Beltway Corridor Study
Regional Beltway Corridor Study Appendices
 
71st Avenue/Centennial Road
 

Traffic Demand Model Review

Transit Development Plan 2011

Transit Management Study